Kitchen cabinets,
built for Miami.

Plywood-box semi-custom and full-custom cabinetry. Slab counters. Salt-air-rated hardware. One license on the permit, fixed price before demo.

Free · No obligations Price your remodel
Step 01 / 04
What are you remodeling?
Pick the closest match — you can change scope on the call.
Approximate footprint?
Rough is fine — we'll measure on the site visit.
160 sq ft · approximate
40160320500+
What's your timeline?
Helps us route to the right PM bench.
Where do we send the line-item version?
Senior PM reviews and emails back within one business day.
Thank you. Estimate locked in.
A senior PM will review your scope and email a line-item budget within one business day. Gil reads every submission personally.
No SMS spam. We don't share, sell, or resubmit your info. One follow-up call, that's it.
3,000+
Homes & Projects
Across South Florida
20+
Years experience
Licensed CGC1530409
4.8
Google rating
Verified homeowner reviews
0%
Financing available
18 months · $0 down
100%
HVHZ compliant
Hurricane-rated, permit-pulled
$2M
Insured
General liability coverage

Homeowner’s guide to kitchen remodeling

A Miami kitchen lives a harder life than almost anywhere else in the country. Eight months of humidity above 70%. Salt drift that finds bay-facing homes ten miles inland. Hurricane-season pressure swings that warp panel doors built for the Midwest. The right kitchen in Miami isn't the most expensive one — it's the one specified for the climate, permitted under the code, and installed by people who've seen what fails at year five.

What "kitchen remodeling" actually means in Miami-Dade

The phrase covers everything from a cosmetic cabinet refresh on an existing footprint to a full structural rework with new electrical service, re-routed plumbing, and a load-bearing wall removed. The cost difference between those two scopes is roughly twelve-fold, which is why "kitchen remodel cost" is one of the most misleading search terms on the internet. A useful conversation about budget starts only after a senior PM walks the room, measures the existing layout, and learns how you actually cook, host, and store.

Most of what we build sits between the two extremes. The typical Miami First kitchen is a refined, 160–280 sq ft cook-and-host space where the existing footprint stays mostly intact but every surface, fixture, and circuit is new. Cabinetry is plywood-box, semi-custom or full-custom. Counters are a 3 cm slab. Plumbing and electrical are re-routed to match the new layout, pulled and inspected under our license. Eight to fourteen weeks on site once the permit is issued.

That tier — what we call "Refined" — accounts for roughly two-thirds of the kitchens we deliver. The contracts land between $45k and $60k for a typical 160 sq ft floor plan. The lower end gets you semi-custom cabinets, a Level-2 quartz counter, and the existing layout retained. The upper end gets you full-custom cabinets in inset or full-overlay, a quartzite or honed-marble slab with a mitered waterfall, and a layout reworked around how you actually use the room.

Why Miami climate changes the materials list

A kitchen built to a national-average spec will look fine on install day and start failing somewhere in years three through five. The first thing to go is hardware: zinc-alloy pulls and unplated steel hinges develop a chalky bloom from salt-laden air, even ten miles from the coast. We specify solid brass, solid bronze, or PVD-finished stainless on every kitchen, regardless of tier. The price difference at install is under $400. The price of replacing 40 pulls in year five is $2,800 plus the labor to drill them out.

The second thing to fail is panel doors built in dry climates. A solid-wood door manufactured in North Carolina at 40% relative humidity will arrive in Miami, sit in a 70%+ environment for the rest of its life, and swell. Mitered corners open. Center panels crack. We build cabinets locally — at our own shop in Dania Beach — under shop humidity that matches the homes they'll live in. The doors leave acclimatized.

The third thing — less visible but more expensive — is the substrate behind tile. National-spec wall board fails fast in Miami-Dade wet zones. We waterproof to current Miami-Dade code in every wet zone, including behind the range and around the sink. It's a $1,200 line item that prevents a $40,000 mold remediation.

Cabinetry: semi-custom vs. full-custom

Semi-custom means cabinet boxes built to standard sizes (typically 3-inch increments) and finished to your spec. The box construction, drawer slides, hinges, and finish are all chosen by you; the dimensions come from a catalog. For most Miami kitchens this is the right answer. The catalog covers 95% of layouts, the lead time is shorter (5–7 weeks vs. 9–12), and the price is roughly 30% lower than full-custom.

Full-custom means every box is built to your exact dimensions, with door styles, profiles, and inlays that aren't in any catalog. This is the right answer when your room has odd angles, structural posts that need wrapping, or a design language that requires non-standard cabinet faces (inset doors with hand-applied beading, brass-and-walnut inlay, curved end panels). It's also the right answer when you're chasing a specific designer aesthetic that catalog millwork can't hit.

On both, the box itself should be plywood — not MDF, not particleboard. Plywood holds screws under load, survives a leaked-sink event, and lasts thirty years. Particleboard boxes fail in five. The price difference is roughly $1,500–$2,500 on a typical kitchen. Always plywood.

Counters: the slab decision

The right counter for your kitchen depends on three things: how you cook, how you feel about patina, and how much you're willing to maintain. Quartz (engineered) is bulletproof, non-porous, and looks the same in year ten as year one. Quartzite (natural) is harder than granite, etch-resistant, and has a depth that engineered surfaces can't replicate, but costs 50–80% more. Marble is the most beautiful and the highest-maintenance — it will etch from lemon juice and acidic wine, and the right buyer of a marble counter loves the patina that develops over years. Soapstone is the dark-horse pick for serious cooks: extremely heat-resistant, develops a soft patina, and forgives every kind of abuse.

We template every counter on-site, after cabinets are installed and scribed to the walls. This is the only way to get a clean fit on Miami homes, where 90-degree corners are rare and walls drift a half-inch over a 12-foot run. The slab cut happens at the fabricator's CNC, with the templates and the slab walked through together by our PM and the fabrication lead. Approve the cut before the saw drops. This is one of two project moments where we ask you to physically come look — the other is the lighting walk-through at the rough-electrical stage.

Permits, inspections, and what "licensed" actually means

Every kitchen we build is permitted under license CGC1530409, regardless of scope. This includes kitchens where the homeowner has been told by an unlicensed contractor that "you don't need a permit for cabinetry" — a statement that is technically true and operationally a disaster. The moment you re-route a single plumbing line, add a circuit for an induction range, or relocate a hood vent, the work requires a permit in Miami-Dade County. Doing it without one means your homeowner's insurance can deny a claim five years later when the unpermitted electrical causes a fire.

A properly permitted kitchen includes plan review, rough plumbing inspection, rough electrical inspection, drywall inspection, and a final certificate of completion in the homeowner's name. We pull all five. The final CC sits in your closing folder if you ever sell the house, and any future buyer's title search will pull it. Unpermitted kitchens become a $15,000–$30,000 closing problem when the buyer's lender flags them.

Timelines and what blows them up

A typical kitchen is four to six weeks on site once the permit is issued and the cabinets have landed. The on-site clock starts at demo and ends at the final inspection. Before the on-site clock starts, the cabinets take two to four weeks to arrive and the permit is filed in the same window. End-to-end, plan on six to ten weeks from "yes, go" to hand-off.

The most common cause of a kitchen running late is appliance delays. Sub-Zero, Wolf, and Miele have all had 8–16 week lead times in 2024–2026 depending on the model. We confirm appliances are in-stock at our trade partner before we issue the build calendar. The second most common cause is design indecision: a client changes their slab selection in week 5, which pushes the templating date, which pushes the install date, which pushes the inspection. We allow two revision rounds in the contract; after that, changes are priced as a written change order with a new completion date.

The third cause is something you can't plan for — an unforeseen condition behind the walls. In a 1950s Miami home, demo can reveal anything from cast-iron drain stacks that need replacing to knob-and-tube electrical that needs a full re-pull. We carry a 7% contingency line item in every contract for exactly this. It rolls back to you if it isn't spent.

Resale value and the only honest number on ROI

Industry surveys routinely claim kitchen remodels return 60–80% of their cost at resale. This number is roughly true and almost useless. The right way to think about a kitchen is that you live in it for ten years, and the right kitchen makes the difference between selling your home in two weeks and selling it in seven months. In a Miami market with rising inventory through 2025–2026, kitchen condition is among the top three buyer dealbreakers — alongside roof age and impact-rated openings. A well-built kitchen doesn't "return" a dollar amount; it removes the line item from the buyer's negotiation list.

Working with a contractor: what to look for

License first. Every legitimate general contractor in Florida has a CGC or CRC number. Look it up at MyFloridaLicense.com — type in the license, see the company history, see any disciplinary actions. Then ask for the certificate of liability insurance, listed to your address and the work scope. Then ask for three references from kitchens delivered in the last 18 months. Call them.

On the contract itself, the single most important clause is fixed price vs. cost-plus. Cost-plus contracts (the contractor charges actual costs plus a 15–25% management fee) are appropriate for projects where the scope is genuinely undefined. A kitchen with a clear design and a clear scope should always be a fixed-price contract. The contractor takes the risk of cost overruns; you take the certainty of knowing what you're spending. Every Miami First kitchen contract is fixed-price.

Finally: meet the project manager. Not the salesperson, not the owner, the PM who will be on your site three days a week for three months. If the company won't introduce them before contract signing, that's information.

Neighborhoods we work in most

Most of our kitchen projects are located throughout Miami-Dade, Broward, and Palm Beach counties, including Coral Gables, Pinecrest, Coconut Grove, Bay Harbor Islands, Brickell, South Beach, Doral, Aventura, Hollywood, Fort Lauderdale, Boca Raton, Wellington, and Palm Beach Gardens.

Each area comes with its own permitting requirements, HOA rules, building standards, and project logistics. We assign each project to the project manager with the strongest experience in that type of property, scope, and location.

We also take on projects beyond these areas when the scope and logistics are a good fit, allowing us to serve clients across a broader part of South Florida.

Rated 4.8★ across
240 reviews
Reviewed on
Google Reviews Houzz BBB Accredited A+ Angi Yelp
★★★★★on Google
Finished a complete remodel earlier this year with Miami First! The final product was amazing! If I had any question or concern, they were on top of it and Joey has no problem if I reach out with any concern. Thank you!
Frank Kendrix2026
★★★★★on Google
Complete kitchen remodel. From beginning demo to end result was within 5 weeks. The workers showed up on time and took pride in their workmanship. No complaints. I highly recommend.
Abraham Zuniga2026
★★★★★on Google
We had a good experience with Miami First Remodeling, they did a good job in our kitchen and floors, it took few months but we are satisfied and happy with the project they did, a special thanks to Joey for being cordial and nice with us all the time, he always answered our questions and concerns very fast.
Natasha Parada2026
★★★★★on Google
We were very happy with their services. They were very professional throughout the entire process of our home addition. The manager Gil was here weekly checking on the project and the entire crew was amazing. Very professional company.
Martha Cabrera2026
★★★★★on Google
Miami First Remodeling is a great company! They offer affordable prices, are punctual, and very professional throughout the entire process. Their showroom is excellent, with many options and great inspiration for your project.
Alecio Schmit2026
★★★★★on Yelp
Miami First Remodeling was so easy to work with. They have a project manager, designer, supervisors, field crew, and a showroom, so everything was organized and simple. Before this, I used handymen for my projects and I will never do that again. Working with a real remodeling company made a huge difference. I love my two new bathrooms and I am very happy with the work.
Natalia V.2026
★★★★★on Yelp
We hired Miami First Remodeling for our kitchen and bathroom renovation. The kitchen looks amazing, especially the cabinets came out beautiful. The team was easy to work with and finished everything nicely. We are very happy with the results!
Boonyarit H.Dania Beach · 2026
★★★★★on Yelp
I love my new kitchen! The team turned out my older kitchen, laundry room and half bath into a beautiful, functional space that fits our home so much better. I also value the craftsmanship from the different trades involved. The team showed real leadership and attention to detail. I highly recommend this company!
Giulia G.2026
★★★★★on Yelp
We hired Miami First Remodeling to renovate our kitchen, and they did an excellent job. They used high-quality materials and offered a stunning selection of countertops. I highly recommend them to anyone planning a remodel!
Marie L.Fort Lauderdale · 2025
★★★★★on Houzz
Selling our house and my realtor said we'd get 40k more if we refreshed the entry, kitchen, and primary bath. Miami First scoped it fast, we prioritized the highest-ROI items, and they finished in 5 weeks. House sold in 6 days for over asking. Best money we spent on the sale.
Dorothy Cantrell2026
★★★★★on Houzz
Converted our detached garage into a mother-in-law suite for my dad. Full kitchenette, bathroom, closet, split HVAC. Juan mapped out the permits, engineering, and inspections upfront so we knew what we were walking into. Nothing surprised us at closeout. My dad has his independence back and we sleep better knowing he's on the property.
Anna Green2026
★★★★★on Houzz
I'm so happy with how my kitchen turned out! The team at Miami First Remodeling made the whole process easy, and they brought my ideas to life better than I expected. The work was on time and professional, and they really cared about the details. Looking forward to start remodeling my bathroom as well very soon!
Marcela Gómez2025

Kitchen questions, answered straight

The questions we hear most often during the first consult. If yours isn't here, Gil himself reads every form submission.

Cabinets are installed within four weeks. For a full kitchen the on-site work is four to six weeks, roughly a week a stage, and the cabinets themselves take two to four weeks to arrive before that starts. End-to-end, plan on six to ten weeks from signed contract to hand-off.

We set up a temporary kitchen for you — usually in the dining room or garage. Microwave, induction burner, fridge, and a wash station on day one of demo. You'll cook again the moment counters are installed, typically 4–6 weeks into the on-site build.

Yes — every job is pulled and inspected under CGC1530409. Submittal, plan review, structural sign-off, plumbing rough, electrical rough, and final CC are all handled by our in-house permitting office. Your name on the final CC, our license on the permit.

This is the most common cause of a kitchen running late, and we plan for it. Appliances are confirmed in-stock at our trade partner before we issue the build calendar. If a delay happens mid-build, we re-sequence cabinets, counters, and tile around the gap so the rest of the work doesn't pause.

Design consultation is included — the layout and cabinet selection for a standard kitchen cost you nothing. A design fee applies only where the project needs full custom selections or a structural change such as removing a wall, and you get that number in writing before any of it starts.

2 years workmanship on all refined kitchens · 3 years on atelier. Manufacturer warranties on cabinetry, hardware, and appliances pass through to you. We come back at the 1-year mark to re-caulk, adjust hinges, and walk the kitchen with you again.

Yes — we work on condo kitchen projects throughout Miami-Dade, Broward, and Palm Beach counties. We handle the building and association requirements, including certificates of insurance, contractor documentation, service-elevator scheduling, delivery windows, and noise-hour compliance. You don't have to manage the HOA or building coordination. We handle it for you.

We work through hurricane season, with a defined storm-prep clause in every contract: 48-hour site secure before a named storm, materials moved to interior or shop, openings protected. We've never lost a project to a storm in twenty years of South Florida operation.

The boring stuff —
that matters

Four things every Florida homeowner should verify before signing a remodeling contract. We make ours public.

Florida DBPR
Florida Cert. General Contractor — CGC1530409
Insurance
General Liability Certificate — $2M coverage
Hurricane-ready
Miami-Dade NOA on all impact products
BBB Accredited
BBB Accredited Business · A+ since 2008
FINANCING OPTIONS
Start your remodel with $0 down*
Up to 18 months at 0% APR*

Spread the cost of your renovation over time with financing options from LendKey, Hearth, Slice by FNBO, and HFS Financial.

Qualified homeowners may have access to promotional 0% APR plans and longer-term monthly payment options. We’ll walk you through the available choices during your estimate with no obligation to finance.

LendKey
Hearth
Slice by FNBO
HFS Financial
Keep exploring your kitchen

Go deeper on the parts of a Miami kitchen that matter most — or see the finished rooms in the gallery.

Tell us about
your home

Drop a short note about the project. Your message routes directly to the PM whose calendar matches your service and timeline — not a generic sales queue.

Gil reads every submission personally — usually before noon the next business day.
No SMS spam. No purchased follow-up. We use your info to schedule one call.
If we're not a fit, we'll tell you in the first call and refer you to someone who is.
Prefer to skip the form? Call us.
(786) 600-2644
Direct line · 1 business day Request a quote
Your details
A senior PM will email back within one business day.
No SMS spam. We don't share, sell, or resubmit your info. One follow-up call, that's it.